Monday, July 18, 2016

Wind Turbine

I had to pull over on the side of the road Saturday morning as Pat and I went to St. Cloud. There was a train full of windmill blades.
There were two large cranes strategically positioned to lift the blade off from the train cars.
It looked like each blade covered two rail cars. We weren't lucky enough to see the cranes lift a blade off from the train. 
On the way back, I drove into the back area. They were placing the blades in a row on the ground.
I wasn't allowed too close. They had a security vehicle parked at the entrance.  
I found out that Anderson Trucking had been contracted to remove the blades from the train to the location where they were will be assembled.
The security guy wasn't sure where that destination was. What can I say? I had to ask!

No comments:

Post a Comment