Tuesday, September 4, 2012

Step by step....

In the three day weekend, I finished tiling the tub/shower and grouting.  I need to buff the tiles, seal the grout, get the faucet and fixtures put back in place, caulk the corners and the area between the tub and the tiles. 

Then the parts I haven't shown you will be the challenge. There was a ledge under the window that the original contractor cut a chunk out of to get the tub in.  He never fixed it.  I will need to use my creativity to find a way to make it work. 

I am thinking when I update the floor that I will put a sand tone tile down. Similar to the color of the grout.